Plywood backing
The majority of the weight of the
installed ventilation system will be
supported by the lower retaining
plate. It must be firmly attached to
the stud framing behind the drywall.
If studs are not available in the
required locations, a plywood
backing (min. ½" (13 mm) thick)
spanning at least two studs must be
installed. Failure to adequately
support the weight as stated may
result in the ventilation system falling
off the wall, causing personal injury
and property damage.
(If plywood backing is not needed,
proceed to the included "Installation
diagram".)
To install a plywood backing
^ Determine and mark the location of
the retaining plate for the canopy as
outlined on the "Installation diagram".
^ Make a cutting line 3" (76 mm) above
and 3" (76 mm) below the outline of
the retaining plate.
26
^ Find the studs to the left and right of
the mounting location by tapping the
wall or using a stud finder.
^ Mark a vertical cutting line along the
center of each stud.
,
CAUTION
When cutting or drilling into the wall
or ceiling, do not damage electrical
wiring and other hidden utilities.
^ Remove the drywall between the
cutting lines and replace it with
plywood of a matching thickness
(min. ½" (13 mm) thick). Tape the
joints and refinish the wall.
^ Proceed to the enclosed "Installation