AquaScape BIOFALLS 1000 Instrucciones y mantenimiento - Página 5

Navegue en línea o descargue pdf Instrucciones y mantenimiento para Sistemas de filtración de agua AquaScape BIOFALLS 1000. AquaScape BIOFALLS 1000 16 páginas.
También para AquaScape BIOFALLS 1000: Instrucciones y mantenimiento (16 páginas)

AquaScape BIOFALLS 1000 Instrucciones y mantenimiento
clamp to be slipped onto the
barb fi tting. Have someone
hold the BioFalls
in place
®
in order to prevent it from
shifting out of level. In some
instances the tubing/hose
may be tight and diffi cult
to use with hose fi tting
barbs. If this is the case, we
recommend heating the hose
with the use of a hair dryer or simply dipping the hose for
a few seconds in very hot water. Lubrication can also be
used; we recommend silicone grease or vegetable oil.
Once installed, the hose clamp can be tightened to secure
the pipe on the fi tting.
• Double check to make sure the BioFalls
installing the plumbing.
• All of the soil removed from the excavation can be spread
and compacted around the BioFalls
fi lter should be completely surrounded by soil by the end of
the project. Be sure to verify that the BioFalls
throughout the process.
NOTE: If installing into an existing pond. You may need to bring in extra
dirt to backfi ll and create a berm around the BioFalls
STEP 3
ATTACH LINER TO THE BIOFALLS
WARNING
Power tools are not recommended for installing the
screws and may strip the nut inserts.
• Prior to installing the waterfall lip, make sure the face of the
fi lter and liner is clean and free of dust and debris.
• Make sure there is at least 2 feet of liner on either side of
the BioFalls
.
®
• Have someone hold the liner against the BioFalls
you line up the waterfall lip over the liner. Make sure there
are no wrinkles and the liner comes up above the sides
of the BioFalls
. Be sure that you have a few inches of
®
slack liner along the front base of your BioFalls
www.aquascapeinc.com |
is still level after
®
, creating a berm. The
®
remains level
®
®
®
while
®
. This will
®
CAN 1-866-766-3426 |
help reduce tension on the
waterfall lip when placing
boulders in front of the unit.
(See Ex. 2)
• Temporarily install the
waterfall lip and liner to the
BioFalls
using the two
®
outermost screws. Using
an awl or nail, poke the fi rst
hole in the liner all the way
through to the inside of the
BioFalls
. (See Ex. 2 & 3) Be
®
careful not to damage the
threads on the nut inserts
when punching the holes
with the awl. Remove the awl
or nail while holding waterfall
lip and liner in place and
begin threading one of the
screws into the fi lter. (See Ex. 3)
• Repeat this process for the
other screw.
• Remove the waterfall lip from
the BioFalls
, keeping the
®
screws installed through the
waterfall lip and liner.
• Place a thick bead of silicone
(not included) across the
insert nuts on the front of the
BioFalls
(See Ex. 4). Pre-
®
installing the two screws in
the earlier steps will make it
easy to line up the waterfall
lip after the silicone is applied
and will keep the silicone
in as thick of a bead as
possible. (See Ex. 5)
• Reattach the waterfall lip and liner using the two pre-
installed screws. (See Ex. 6)
• Using an awl or nail, poke the remaining holes in the
waterfall lip and install the rest of the screws.
• Remove extra liner, using the waterfall lip as a guide. Install
the rest of the screws. (See Ex. 7)
• Let dry for at least one hour before introducing water.
US 1-866-877-6637
Ex. 3
Ex. 4
Ex. 5
Ex. 6
Ex. 7
5