Aquasub engineering ADP 11T Manual de instrucciones - Página 9

Navegue en línea o descargue pdf Manual de instrucciones para Bomba de agua Aquasub engineering ADP 11T. Aquasub engineering ADP 11T 15 páginas. Submersible dewatering pump. texmo adp series

MAINTENANCE
For uninterrupted performance, planned maintenance and inspection
are indispensable. Please follow below guidelines while maintaining or
inspecting the pump.

MAINTENANCE PRECAUTION

Disconnect the power supply before starting maintenance or inspection of
the pump to avoid electrical shock.
Ensure the pump is intact, free from damage and has no loose components.
Use appropriate tools for executing maintenance, or it may lead to
component damage or personal injuries.
If you find any damages or abnormalities like vibration, noise, smell etc. in the
pump, switch off the pump and contact the dealer where this pump was
purchased or the "AQUASUB ENGINEERING's" sales office in your area for
proper maintenance.
REVERSE FLUSHING OF THE PUMP
It is a simple procedure to clean impeller and casing by forcing water
by an external pump
procedure once in a week to have long trouble free operation.
OIL INSPECTION AND CHANGING
INSPECTING OIL : It is recommended to
inspect the oil for every 1000 Hrs of
usage, or once in six months whichever
is earlier. Remove the drain plug by a
screw driver and take out a small
amount of oil by slightly tilting the
pump. If the oil looks like milky or
intermixed with any other content, the
oil is contaminated.
It may be due to the failure of sealing system, which should be repaired
immediately. It can be solved by disassembling the pump and replacing
relevant components and replacing oil.
REPLACING OIL : It is recommended to change the oil for every 2000 Hrs of
usage, or once in a year whichever is earlier. Drain oil completely then pour 0.3
litres of "SAE 20/40 OIL (coolant oil)" or "PENTAGON COOLCUT S OIL" and
close the drain plug.
from delivery side. It is recommended to follow this