Diamondback HD Manual de instalación

Navegue en línea o descargue pdf Manual de instalación para Accesorios para automóviles Diamondback HD. Diamondback HD 2 páginas. Truck cover for 2005-up toyota tacomas with the 60.3" bed
También para Diamondback HD: Manual de instalación (2 páginas), Manual de instalación (2 páginas), Manual de instalación (2 páginas), Manual de instalación (2 páginas)

Diamondback HD Manual de instalación
(800) 935-4002 | DIAMONDBACKCOVERS.COM
INSTALLATION GUIDE
60 minutes
Normal Install Time
PARTS INCLUDED:
Cab Panel
Center Panel
Tailgate Panel
TOOLS REQUIRED:
9/16"
Ratchet Wrench
Socket
POSITION THE PANELS
Place the center panel across the
1
center of bed, cheated slightly toward
the tailgate.
Make the sure the
arrow sticker on the
underside of the
center panel is
pointing toward the
tailgate.
Repeat step three for the
4
tailgate panel.
Position the cover
5
front to back so that
the leading edge of the
cab panel lines up with
the leading edge of the
bulkhead.
Keep an eye out for these icons:
Safety Catch
Gas Springs (4)
Cap Clamps (4)
7/16"
1/8"
Drill
Socket
Hex Key
Finger-tighten the cap clamps at
2
each corner of the center panel.
The bottom halves of the cap
clamps should be in the deck
rail system.
IMPORTANT!
Important installation information
Grommets (2)
1/8" or
1" Bit
Marker
3/16" Bit
Slide the cab panel onto the center panel by mating their hinges. Close the
3
cab panel slowly. Make sure it doesn't hit your cab.
To avoid hinge damage, do not close the
panel until hinges are fully mated: Tilt the
panel past 90° and push to the left until the
hinge lock tabs interlock.
Center the DiamondBack cover
6
side to side on the truck.
Tighten the cap
7
clamps with a
9/16" socket.
Retighten your clamps after 100
miles. Check them every time
you haul on top.
2005-UP TOYOTA TACOMAS
with the 60.3" Bed
Helpful Hints
Tips to assist installation
PRE-INSTALLATION NOTES:
1. Install the Bulkhead Prep Kit before installing
your DiamondBack cover. Refer to the Bulkhead
Prep Kit Installation Guide for details.
2. If you are installing a Low-Profile Cab Guard
or HD Cab Guard, you should mount it prior to
installing your DiamondBack. Refer to the Cab
Guard Installation Guide for details.
3. If you are installing a Side-Loading ATV Carrier
on cargo bed longer than 6 feet, you must mount
the center panel adapter bars prior to installing
your DiamondBack HD. Refer to the Side Adapter
Bars Installation Guide for details.
4. It's possible for one person to install a DiamondBack
solo, but the whole process, especially positioning
the panels and adjusting the lock rods, is much
easier with two people.
Mating hinges is
easiest when you
line up the longer,
left hinge pin first.
CONTINUED ON OTHER SIDE