LIFTING
While building, the structure has to be lifted multiple times so that the assembly can easily be done on floor
level. The structure is designed for two lifting methods:
1. Lifting from below (for example with a traverse lift) by using the subframe. Requirements lifting device:
• minimum lifting height: 6 meter
• minimum save working load: 300 kg
2. Lifting from above (for example with a crane) by using lifting slings (2 meter, 1000 KG) and the hooks of the
X-connectors
!
Note: this lifting methode
requires more height for building
8 | 32
STEP 4
Mount the first end of the 8 tension cables