Arcan CP201 Manual de instrucciones de montaje - Página 3
Navegue en línea o descargue pdf Manual de instrucciones de montaje para Jacks Arcan CP201. Arcan CP201 12 páginas. Shop press
PARTS LIST
ESTIMATED ASSEMBLY TIME: 30 MINUTES
Press Frame - 1
Press Bed - 1
Press Feet - 2
Z Bar - 1
1/2"-13 x 1-1/2"
Hex Head Bolts - 10
1/2" Nuts - 10
Washers - 10
1" x 12" Press Pins - 2
CP201 Operation Manual
Air Motor
Pump and Ram - 1
Ram Frame - 1
Pump Extension Handle - 1
ACCESSORIES
3/4" x 3" x 12"
Press Plates - 2
Accessory only -
Not needed for assembly
Pushing Adapter - 1
Accessory only -
Not needed for assembly
Bearing Shield - 1
Accessory only -
Not needed for assembly
TOOLS NEEDED
3/4" and 9/16" sockets and wrenches
Examine box contents, then proceed with the following instructions.
2