Crescend Technologies C7 SERIES Manual de instalación y mantenimiento - Página 14
Navegue en línea o descargue pdf Manual de instalación y mantenimiento para Amplificador Crescend Technologies C7 SERIES. Crescend Technologies C7 SERIES 17 páginas. Continuous duty power amplifier
5.
MAINTENANCE
5.1.
INTRODUCTION
This section contains periodic maintenance and performance test information for the C7
Series. It also contains a list of test equipment required to perform various tests.
NOTE:
Check your sales order and equipment warranty before attempting to service
or repair the unit. Do not break the seals on equipment under warranty or the
warranty will be null and void. Do not return equipment for warranty or repair
service until proper shipping instructions are received from the factory.
5.2.
PERIODIC MAINTENANCE
Periodic maintenance requirements are listed in Table 5-1. Table 5-1 also lists the intervals
at which the tasks should be performed.
WARNING: Wear proper eye protection to avoid eye injury when using
compressed air.
TASK
Clean Air Vents/Check
Fan
Inspect Cables and
Connectors and General
Site Conditions
5.3.
CLEANING AIR INLETS/OUTLETS
The air inlets and outlets should be checked every 30 days and cleaned if necessary. If the
equipment is operated in a severe dust environment, it should be checked and cleaned
more often. If dust and dirt are allowed to accumulate, the cooling efficiency will be
diminished. Using either compressed air or a brush with soft bristles, loosen and remove
accumulated dust and dirt from the air inlet panels.
Check that the fan is running smoothly. A slow running or noisy fan may indicate an
imminent fan failure. Replace immediately with a similar to insure long term reliability.
Heat is one of the biggest factors in reducing the reliability of your amplifier. Make sure the
fan has access to cool and clean airflow within the rack.
Copyright Crescend Technologies
Table 5-1. Periodic Maintenance
INTERVAL
ACTION
30 Days
Inspect and clean per paragraph 5-3.
Verify fan is working properly.
6 Months
Inspect signal and power cables for
frayed insulation and proper attachment.
Check RF connectors to make sure that
they are tight. Inspect the lightning
protection system and ground at the site.
14
040003A005 Rev 1