Crestron BB-1000L Manual de instalación - Página 7

Navegue en línea o descargue pdf Manual de instalación para Bastidores y soportes Crestron BB-1000L. Crestron BB-1000L 12 páginas. Wall mount back box
También para Crestron BB-1000L: Inicio rápido (4 páginas), Manual de instalación (12 páginas)

Crestron BB-1000L Manual de instalación
Crestron BB-1000L
Required Tools
Procedure
Installation Guide - DOC. 6060A

Mounting

NOTE: This device must be installed in accordance with local building codes.
#2 Phillips tip screwdriver
Level
Complete the following procedure (refer to illustration below) to mount the
assembly.
1. Position assembly to the front edge of the stud and align it as even and as
flush as possible.
2. Use the level and verify that the back box is horizontal. Leveling must be
done before proceeding.
3. Attach the assembly to the left or right side of the stud with standard
drywall screws or nails (supplied by other).
4. Feed cable through knockout holes.
Mounted View with Cover Plate (Mounting Example - Drywall Not Shown)
IT IS IMPORTANT THAT THESE
TWO SURFACES BE AS EVEN AND
FLUSH AS POSSIBLE WHEN
MOUNTING BACK BOX
BACK BOX MUST BE MOUNTED
TO THE STUD AS LEVEL AS
POSSIBLE
METAL COVER PLATE 2004826
USE TO COVER CUTOUT IN THE
DRYWALL IF DEVICE IS NOT
INSTALLED (OPTIONAL).
5. After installing drywall, carefully create a square cutout measuring
4 7/16 inches (113 mm) by 4 7/16 inches.
NOTE: Confirm that the four tapped holes in the mounting plate are
exposed to accept the device's mounting screws.
Wall Mount Back Box
HOLES FOR STANDARD
DRYWALL SCREWS
OR NAILS TO MOUNT
BACK BOX
QTY.4 #4-40 X 1 1/2"L
(2007190)
Wall Mount Back Box: BB-1000L • 3