Sharp 13N-M100B Manual de servicio - Página 7

Navegue en línea o descargue pdf Manual de servicio para TV Sharp 13N-M100B. Sharp 13N-M100B 30 páginas.

Sharp 13N-M100B Manual de servicio

INSTALLATION AND SERVICE INSTRUCTIONS

Note:
(1) When performing any adjustments to resistor controls and transformers use non-metallic
screwdrivers or TV alignment tools.
(2) Before performing adjustments, the TV set must be on at least 15 minutes.
CIRCUIT PROTECTION
The receiver is protected by a 4.0A fuse (F701),
mounted on PWB-A, wired into one side of the AC
line input.
X-RADIATION PROTECTOR CIRCUIT TEST
After service has been performed on the horizontal
deflection system, high voltage system, B+ system,
test the X-Radiation protection circuit to ascertain
proper operation as follows:
1. Apply 120V AC using a variac transformer for accurate
input voltage.
2. Allow for warm up and adjust all customer controls
for normal picture and sound.
3. Receive a good local channel.
4. Connect a digital voltmeter to TP653 and make sure
that the voltmeter reads 21.1 ±1.5V.
5. Apply external 27.9V DC at TP653 by using an
external DC supply, TV must be shut off.
6. To reset the protector, unplug the AC cord and make
a short circuit between TP651 and TP652. Now make
sure that normal picture appears on the screen.
7. If the operation of the horizontal oscillator does not
stop in step 5, the circuit must be repaired before the
set is returned to the customer.
HIGH VOLTAGE CHECK
High voltage is not adjustable but must be checked
to verify that the receiver is operating within safe
and efficient design limitations as specified checks
should be as follows:
1. Connect an accurate high voltage meter between
ground and anode of picture tube.
2. Operate receiver for at least 15 minutes at 120V AC
line voltage, with a strong air signal or a properly tuned
in test signal.
3. Enter the service mode and select the service
adjustment "S03" and Bus data "01" (Y-mute on).
4. The voltage should be approximately, 24.0kV (at zero
beam).
If a correct reading cannot be obtained, check circuitry
for malfunctioning components. After the voltage test,
make Y-mute off to the normal mode.
7
13N-M100B/150B
CN13M10B