Siemens 1-3 Control Technology p1 Series Instrucciones de instalación/sustitución - Página 12

Navegue en línea o descargue pdf Instrucciones de instalación/sustitución para Equipamiento industrial Siemens 1-3 Control Technology p1 Series. Siemens 1-3 Control Technology p1 Series 34 páginas. Lighting panel

Siemens 1-3 Control Technology p1 Series Instrucciones de instalación/sustitución
Chapter 3
Installation
Mounting Holes
Interior mounting holes are to be
aligned with the bolt-on screws
installed on the P1 enclosure base
and tighten the provided wing nuts
to secure the position of the interior.
In case of the interior level needs to
be adjusted, refer to "Mounting and
Leveling Kit IMK1" instruction sheet
which is provided during the ship-
ment of the panel.
In case of i-3 Control Technology
components needing to be installed
in the panel, please refer to the
step-by-step installation instructions
described on Chapter 6 - System
Components.
Figure 3.3
Interior Mounting Holes Location
Additional BQD Breaker and
CPOD Installation
In case additional BQD breakers and
CPODs need to be installed in the
panel, please refer to the step-by-
step installation instructions
described on Chapter 6 - System
Components under BQD Breaker and
CPOD sections.
Location for Low Voltage Conduit
Figure 3.4 below illustrates the
location for the low voltage conduit
entry access on i-3 controller.
Mounting Holes
11