Siemens SINAMICS G120 Primeros pasos - Página 5

Navegue en línea o descargue pdf Primeros pasos para Equipamiento industrial Siemens SINAMICS G120. Siemens SINAMICS G120 30 páginas. Using blocksize converters in marine applications
También para Siemens SINAMICS G120: Primeros pasos (46 páginas), Manual de instrucciones (32 páginas), Instrucciones de instalación del hardware (2 páginas), Instrucciones de instalación y manual del usuario (2 páginas), Instrucciones de instalación (2 páginas), Instrucciones de instalación (2 páginas), Instrucciones de uso Compact (32 páginas), Manual (42 páginas), Primeros pasos (50 páginas), Manual del dispositivo (34 páginas), Manual de instalación rápida (2 páginas), Descripción de la aplicación (50 páginas), Instrucciones de uso Compact (2 páginas), Manual (31 páginas), Manual de aplicaciones (34 páginas), Instrucciones de uso Compact (2 páginas), Instrucciones de uso Compact (2 páginas)

Siemens SINAMICS G120 Primeros pasos
CAUTION
Children and the general public must be prevented from accessing or approaching
the equipment!
This equipment may only be used for the purpose specified by the manufacturer.
Unauthorized modifications and the use of spare parts and accessories that are not
sold or recommended by the manufacturer of the equipment can cause fires, electric
shocks and injuries.
NOTICE
Keep these instructions within easy reach of the equipment and make them available
to all users.
Whenever measuring or testing has to be performed on live equipment, the
regulations of Safety Code BGV A2 must be observed, in particular § 8 "Permissible
Deviations when Working on Live Parts". Suitable electronic tools should be used.
Before installing and commissioning, please read the safety instructions and
warnings carefully and all the warning labels attached to the equipment. Make sure
that the warning labels are kept in a legible condition and replace missing or
damaged labels.
Ensure that the appropriate circuit-breakers/fuses with the specified current rating
are connected between the power supply and the inverter.
These instructions assume that the user is fully conversant with the use of the
following technologies:
- PLCs
- The commissioning software STARTER
- PROFIdrive profiles and protocols.
The commissioning procedure outlined in this manual is for Standard Inverters only -
Fail-safe commissioning is covered in the Operating Instructions.
CU240E
Getting Started, 10/2007, A5E01301680B AA
Warnings and Cautions
5