Siemens SINAMICS G120P VSD Manual de introducción - Página 44
Navegue en línea o descargue pdf Manual de introducción para Equipamiento industrial Siemens SINAMICS G120P VSD. Siemens SINAMICS G120P VSD 50 páginas.

7 Troubleshooting
7.1 Diagnostic Menu
The Diagnostics menu allows the user to access the following function:
Acknowledge all faults
Faults
History
Status
To access the Diagnostics menu, the following actions should be performed:
1. Using the
and
2. Press
to select the Diagnostics menu.
3. Using the
and
4. Press
to display the selected screen.
Pressing
for more than 3 seconds at any point during this
sequence will cause the BOP-2 to return to the status screen. A
short press of the
previous screen.
The individual functions are described below.
7.1.1 Acknowledge faults
When a fault condition occurs within the Inverter/motor system; the system is stopped by the Inverter and
requires that all faults are acknowledged before restarting the system.
To acknowledge all active faults within the Inverter/motor system, the following procedure should be
performed:
1. Using the
and
2. Press
to select the Diagnostics menu.
3. Using the
and
4. Press
to acknowledge all active faults.
5. The BOP-2 will automatically return to the top level diagnostic
menu.
Pressing
for more than 3 seconds at any point during this
sequence will cause the BOP-2 to return to the status screen. A
short press of the
previous screen.
Page 44 of 50
keys navigate to the Diagnostics screen.
keys select the required screen.
key will cause the BOP-2 to return to the
keys navigate to the Diagnostics screen.
keys select ACKN ALL screen.
key will cause the BOP-2 to return to the
Building Technologies
Last Revised: 4/11/2011