Siemens XC1001-A Operación - Página 25
Navegue en línea o descargue pdf Operación para Unidad de control Siemens XC1001-A. Siemens XC1001-A 32 páginas. Extinguishing control unit
6
Maintenance
6.1
Preventive maintenance
6.1.1
Performed by the customer
6.1.2
Performed by the maintenance technician
6.2
Checking all Led and internal buzzer
6.3
Checking alarm sounders
6.4
Checking optical warning panels
Building Technologies
Fire Safety
Once a week
Check that all leds and buzzer are activated with the "Led test"
Every 6 months
Check all alarm sounders and illuminated warning panels
Check the Remote transmission connection
The maintenance operation of an extinguishing installation must be performed by
a qualified and trained technician who is familiar with XC10 control panel and
knows all the risks relating to extinguishing.
Detailed actions are described in the technical manual
1. Press the key « Lamp test » (9) and check that:
all Led light up
internal buzzer sounds
all display segments light up and software version appears (requires plastic
cover remove for XC1001-A )
1. Enable operating access level 2
2. Press and hold down « Key 1 » on numeric keypad then press key « Silence/Re-
sound sounders » (5) within 5 seconds:
sounders are enabled for 30 seconds
« Sounder » Led (19) flashes slowly
3. Press « Lamp test » key (9) to end the test before 30 seconds, if necessary
1. Enable operating access level 2
2. Press and hold down « key 2 » on numeric keypad then press key « Silence/Re-
sound sounders » (5) within 5 seconds:
optical warning panels are activated for 30 seconds
Maintenance
25
A6V10257477_c_en_--
2012-06