Cisco C8510MSR-SKIT-DC - Catalyst 8510 Multiservice Switch Router Primeros pasos - Página 5
Navegue en línea o descargue pdf Primeros pasos para Hardware de red Cisco C8510MSR-SKIT-DC - Catalyst 8510 Multiservice Switch Router. Cisco C8510MSR-SKIT-DC - Catalyst 8510 Multiservice Switch Router 16 páginas. Getting started
Installing the MCU MSE 8510
Important
read the safety information guide for the MSE 8000 chassis at
http://www.cisco.com/go/telepresence/safety.
Although blades are hot-swappable parts, you must only remove one
!
blade at any time. Remove the power from the MSE 8000, if you need to
remove more than one blade at a time.
Before hot-swapping a blade, shut down the blade using the web interface.
!
Do not shut down a blade during a software upgrade or if the blade is
processing (for example if a conference is taking place on a blade).
The MSE 8000 backplane uses high performance data connectors. Do not
!
remove MCU MSE 8510 blades unless necessary because doing so may
reduce the life of these connectors.
Make sure that you have the correct power requirements and sufficient
!
power in your PSU; for information on powering the MSE 8000 refer to
the Getting Started Guide on
conferencing-documentation.jsp).
Step one: Install the MCU MSE 8510 into the MSE 8000 chassis
You must install either a blade or a blanking blade in each of the ten
!
positions in the chassis.
The Supervisor blade must be installed into slot 1 of the MSE 8000
!
chassis.
1
Remove the blade or blanking blade from the slot into which you are going to
install the MCU MSE 8510:
i
Using a No.1 Phillips screwdriver, loosen the screws in the retaining latches
with an anti-clockwise quarter turn.
ii
Open both retaining latches on the front of the blade or blanking blade.
When open, a retaining latch is at a 90
the blade.
: Before installing the MCU MSE 8510 into the MSE 8000,
http://www.tandberg.com/support/video-
Installing the MCU MSE 8510
angle perpendicular to the front of
°
5