Cisco Firepower 2120 Manual - Página 11

Navegue en línea o descargue pdf Manual para Hardware de red Cisco Firepower 2120. Cisco Firepower 2120 12 páginas. Rack-mount and ground the chassis
También para Cisco Firepower 2120: Manual de implantación (8 páginas), Primeros pasos (42 páginas)

Cisco Firepower 2120 Manual
Rack-Mount and Ground the Chassis
Figure 9: Insert the Cable into the Grounding Lug
Step 3
Use the crimping tool to secure the grounding cable in the grounding lug.
Step 4
Remove the adhesive label from the grounding pad on the chassis.
Step 5
Place the grounding lug against the grounding pad so that there is solid metal-to-metal contact, and insert the two screws
with washers through the holes in the grounding lug and into the grounding pad.
Ground the Chassis
Rack-Mount and Ground the Chassis
11