Chapter 2
Introduction to the Cisco SCE8000 10GBE Platform
Cisco SCE8000 Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom,
photocopy the following Cisco SCE8000 Installation Checklist
procedure or verification is completed. When the checklist is completed, place it in your site log along
with the other records for your new Cisco SCE8000 platform.
Table 2-11
Cisco SCE8000 Installation Checklist
Task
Date Cisco SCE8000 received
Cisco SCE8000 and all accessories unpacked
Safety recommendations and guidelines reviewed
Topology verified: number of Cisco SCE8000 platforms, number of
links, and whether inline or receive-only
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, needed
for initial configuration available (refer to
page
5-2)
Required tools available
Network connection equipment available
Cisco SCE8000 mounted in rack
System grounding established, if required
AC/DC power cables connected to AC/DC sources and Cisco
SCE8000 chassis
Optical bypass modules installed (optional)
Console port set for 9600 baud, 8 data bits, no parity, and 1 stop bit
(9600 8N1)
ASCII terminal attached to console port
Management port is operational
Network interface cables and devices connected
System power turned on
System boot complete (Status LED is on)
10 GBE line ports operational
Correct hardware configuration displayed after system banner
appears
OL-16478-05
Initial Setup Parameters,
Cisco SCE8000 10GBE Installation and Configuration Guide
Cisco SCE8000 Installation Checklist
(Table
2-11). Indicate when each
Verified By
Date
2-17