Whirlpool UXI6536BSS Instrucciones de instalación y manual de uso y mantenimiento - Página 9

Navegue en línea o descargue pdf Instrucciones de instalación y manual de uso y mantenimiento para Campana de ventilación Whirlpool UXI6536BSS. Whirlpool UXI6536BSS 32 páginas. 36" (91.4 cm) island-mount canopy range hood
También para Whirlpool UXI6536BSS: Instrucciones de instalación y manual de uso y mantenimiento (32 páginas)

Whirlpool UXI6536BSS Instrucciones de instalación y manual de uso y mantenimiento

Assemble Range Hood

1. Install transition on top of hood (if removed for shipping) with
2 - 3.5 x 9.5 mm sheet metal screws.
A
B
A. Vent transition
B. 3.5 x 9.5 mm screw
2. Position the 4 vertical supports (A) with the notches at the
bottom and attach to the range hood using 16 - 4 x 8 mm
screws.
3. Attach the horizontal support (B) using 8 - 4 x 8 mm screws.
A
C
A. Vertical supports
B. Horizontal support
C. Notched end
4. Attach a second set of vertical supports (A) and set the
vertical height (B). See "Installation Dimensions" in the
"Location Requirements" section to help determine the
desired dimension for vertical height "B."
A
A. Vertical supports
B. Vertical height
B
A
C
A
B

Install Range Hood

Non-Vented (recirculating) Installation
1. Attach the air deflector to the upper horizontal support using
4 mounting screws.
B
A
A. Deflector
B. Mounting screws
2. Measure the length of 6" (15.2 cm) duct needed to connect
the transition to the deflector.
NOTE: Vent should fit up inside the deflector 1" (2.5 cm)
minimum.
3. Install vent between the transition and the deflector.
NOTE: To make vent installation easier, temporarily remove
the deflector from the chimney support bracket and replace
after vent section is in place.
4. Seal all connections with vent clamps. Continue with "Range
Hood Installation" in this section.
Range Hood Installation
1. Using 2 or more people, lift the range hood assembly and
attach it by snapping the vertical supports to the spring clips
in the upper horizontal support bracket that is mounted to the
ceiling.
2. Install 16 - 4 x 8 mm screws and tighten to secure.
A
A. Mounting screws
Connect Vent System
1. Install vent system.
2. Push duct over the exhaust outlet. Seal all connections with
vent clamps.
3. Use caulk to seal all openings.
B
9