ERGODYNE SHAX 6094 Manual de instrucciones

Navegue en línea o descargue pdf Manual de instrucciones para Equipamiento de camping ERGODYNE SHAX 6094. ERGODYNE SHAX 6094 2 páginas. Tent weight bags

instRuctiOns:
Read over these instructions before
assembling and always use caution!
step 1. Completely set up your SHAX
Work Shelter. To see an instructional
assembly video, visit www.ergodyne.com.
step 2. After unfolding the tent weight bag,
open the funnel top and fill each bag
with sand or dirt using a shovel. Each
tent weight is designed to hold 40 lbs.
worth of sand when completely full.
(Sand not included. Go pound your own.)
step 3. Once the bag is filled, fold the funnel
top opening and push into the top of
the bag.
step 4. Pull the drawstring closure to seal
the bag tightly.
step 5. Wrap the weights around the tent
leg. Using the hook and loop strap,
wrap it around the weight by pressing
firmly to secure. With two weights,
place each weight on opposing tent
poles for optimal performance
and balance.
© 2011 Ergodyne All Rights Reserved. All Wrongs Reversed.
#6094
®
Portable
1021 Bandana BLVd. East // suitE 220
saint PauL, Mn 55108
tOLL-FREE 800 225 8238 // int'L +1 651 642 9889
www.ERgOdynE.cOM
Tent Weight Bags
Instructional Guide
2.
3A.
3C.
5B.
5A.
3B.
3D.
5C.