Xerox iGen3 Manual de planificación - Página 14

Navegue en línea o descargue pdf Manual de planificación para Software Xerox iGen3. Xerox iGen3 38 páginas. Solutions planning guide
También para Xerox iGen3: Folleto (8 páginas)

C.P. Bourg Document Finisher (BDFx)

Environmental Requirements

Estimated Installation Time

Operating Supplies

Environment
Temperature
Humidity
Heat Emission
Sound Emission
Altitude
Environment
Temperature
Humidity
Heat Emission
Sound Emission
Altitude
C.P. Bourg installs the BDFx (including BCFx and SQEDG) and the
estimated installation time is 4 – 8 hours.
Installation and customer training will require approximately 2 days
total.
Each Bourg Document Finisher is delivered with 2 stitch heads. The
machine can be equipped with 1 or 2 additional stitch heads (any
additional stitch heads must be ordered when the machine is
ordered as this is not an upgrade that can be done in the field).
There are no operating supplies for the BSR.
Supply No.
Description.
9158017
Wire Cassette (Acme Stitch Heads)
9158018
Wire Spool (Hohner Stitch Heads)
You can reach C.P. Bourg Customer Service using the following
phone number:
United States and Canada: 1-508-998-2171
For Europe, please visit the C.P. Bourg web site and select your
region:
http://www.cpbourg.com
1-6
BDFx / BCFx / SQEDG
41 - 85° F (5 - 29°C)
50 - 85%
BDFx: 2560 btu / hr
BCFx: 1590 btu / hr
SQEDG: 2400 btu / hr
72 db
-100 ft. (-31m) to 4,000 ft. (1,219 m)
BSR
41 - 85° F (5 - 29°C)
50 – 85%
1,535 btu / hr
55 db
-100 – 4,000 ft (-31 – 1,219 m)
Quantity / Unit
50, 0000 stitches / cassette
(2 cassettes / box)
50, 0000 stitches / spool