Step 5: Wiring and Piggyback Plug Connections
The wiring diagram shows 10 terminals on the quick snap terminal blocks
that consists of five pairs of connections. Make sure to read and review
the connector examples on page 7 for proper installation prior to wiring.
Note: The quick snap terminal blocks, are herein referred to as "terminal"
for instruction purposes. The installation example shown is for 120VAC,
for 240VAC installation the neutral (N) wire would be replaced by line
connection (L2) and white wire would include a red band to indicate the
wire is hot.
1) The first cable grip, starting at the right, has a cable grip divider
allowing for two power sources to be brought into the enclosure.
The right side of the cable grip is used for the pump power
(attached in series). The line wire is connected to terminal 9 and
neutral wire is terminated by the two-position Wago connector.
The left side of the cable grip is used for the alarm/control power,
which is connected to terminals 7 and 8. Terminal 7 is the neutral
(N) connection and terminal 8 is the line connection (L1). The
pump and alarm/control power ground wires are terminated using
the three-position Wago connector. After bringing in the cables,
firmly tighten the cable grip by twisting clockwise until securely
fastened.
2) The female receptacle comes pre-installed in the middle cable
grip. The line wire is connected to terminal 10, neutral wire is
terminated by the two-position Wago connector, and ground wire
is terminated by the three-position Wago connector.
3) The third cable grip has cable grip dividers allowing for three
sensor connections. The pump control float switch is connected
to terminals 1 and 2. The filter switch is connected to terminals 3
and 4. The high level alarm float switch is connected to terminals
5 and 6. After bringing in the cables, firmly tighten the cable grip
by twisting clockwise until securely fastened.
4) NEVER leave ground wire(s) exposed, use provided Wago
connector for wire termination.
Step 6: Testing and Backfill
Make sure all steps of the installation and wiring process is completed
and there is power to the product.
1) TEST ALARM LEDs and BUZZER
Press the test/silence pushbutton, lifetime pump run event counter
statistic should display, then alarm LEDs should illuminate while
cycling between red, green, blue, and off. The OLED screen should
display a TESTING (COLOR) event for respective LEDs after event
statistic is displayed. Last, the buzzer should annunciate and OLED
screen should display a TESTING BUZZER event.
2) TEST ALARM FLOAT SWITCH
Activate the alarm float switch, the red LEDs should illuminate,
flashing and the buzzer should annunciate. The OLED screen should
display a HIGH LEVEL ALARM event.
3) TEST ALARM SILENCE
Press the test/silence pushbutton on the front of the enclosure while
the alarm float switch is activated. The red LEDs should keep flashing
and the buzzer should silence.
4) TEST FILTER SWITCH
Activate the filter switch, the amber LEDs should illuminate, flashing
and the buzzer should annunciate. The OLED screen should display a
FILTER ALARM event.
5) TEST PUMP AND CONTROL/IN-LINE PUMP FLOAT SWITCH
Make sure the tank has water to perform the testing. Activate the
control/in-line pump float switch, the blue LEDs should illuminate and
the OLED screen should display a PUMP RUN event and the pump
amps are displayed.
6) RECOMMENDED SYSTEM SETTINGS
Alderon™ recommends changing the factory settings for: high amp
level, extended pump run time, and gallons per minute.
7) TEST WEEKLY
To ensure the product is functioning properly, test once a week.
BACKFILL: After installation and testing, backfill with dirt/soil.
1
2
3
4
5
6
WAGO
OPTIONAL PIGGYBACK PLUG CONNECTIONS
1) Plug the male end of the piggyback plug on the in-line pump switch power
cable into the pre-installed female power receptacle inside the post (5A).
2) Plug the male end of the pump power cable into the female end of
the piggyback plug on the in-line pump switch power cable (5B) from #1.
5A
Menu System - Main Menu
MAIN MENU - System Normal
From SYSTEM NORMAL screen, press the
MENU button to access main menu and
HAND/OFF AUTO will appear. Pressing
MENU button from a blank screen will also
access the main menu.
1.0 | MAIN MENU - HOA Pump Mode
From HAND/OFF AUTO screen, press right
arrow key for menu to view system override
options. Press down arrow key to the
RESETBLE HISTORY screen.
2.0 | MAIN MENU - Resettable History
From the RESETBLE HISTORY screen,
press right arrow key for menu. Press down
arrow key to the SETTINGS screen.
3.0 | MAIN MENU - Settings
From the SETTINGS screen, press right
arrow key for menu to enter password and
program system settings. Press down arrow
key to the LIFETIME HISTORY screen.
4.0 | MAIN MENU - Lifetime History
From the LIFETIME HISTORY screen, press
right arrow key for menu. Press down arrow
key to the MODEL / FIRMWARE screen.
5.0 | MAIN MENU - Model/Firmware
From the MODEL/FIRMWARE screen, press
down arrow key to bring you back to the
HAND/OFF AUTO screen.
Note: The down arrow key will cycle through
the menu options until a specific option is
selected using the right arrow key.
Power Wiring
(steps 1 and 2)
Alarm/Control
N/L2
7
7
8
L1
8
9
10
Pump Power
L1
9
Factory Wired
10
Alarm Wiring
(step 3)
Pump Control
1
Switch
2
GROUND
3
Filter Switch
4
WAGO
5
Alarm Float Switch
6
(120VAC Example Shown)
5B
Power