Alderon Industries Mini Power Post MPMS-0001 Manual - Página 2
Navegue en línea o descargue pdf Manual para Micrófono Alderon Industries Mini Power Post MPMS-0001. Alderon Industries Mini Power Post MPMS-0001 4 páginas.
Step 5: Wiring
The wiring diagram shows four terminals on the quick snap terminal block
that consists of two pairs of connections. Make sure to read and review
the connector examples on step 4 for proper installation prior to wiring.
Note: The quick snap terminal block, is herein referred to as "terminal"
for instruction purposes. The installation example shown is for 120VAC,
for 240VAC installation the neutral (N) wire would be replaced by line
connection (L2) and white wire would include a red band to indicate the
wire is hot.
1) The alarm and pump power connections are factory wired from the
terminals and pre-installed female receptacle in the middle cable
grip. The wires are terminated by the pre-installed Wago connectors
which are separated into line, neutral, and ground connections.
2) The first cable grip, starting at the right, has a cable grip divider
allowing for two cable sources to be brought into the enclosure. The
top side of the cable grip is used for the both the alarm and pump
power, attached in series. The line (L1), neutral (N), and ground (G)
wires each get terminated by the Wago connectors. After bringing in
the cables, firmly tighten the cable grip by twisting clockwise until
securely fastened.
If the system is equipped with a remote alarm panel, high level alarm float
switch, and/or filter switch, continue with the steps below before proceeding
to power connection or testing.
3) The first cable grip, starting at the right, has a cable grip divider
allowing for two cable sources to be brought into the enclosure. The
bottom side of the cable grip is used for the customer supplied
sensor wire. Use the provided Wago connectors to terminate the
black (1C), red (1B), and white (1A) wires. After bringing in the
cables, firmly tighten the cable grip by twisting clockwise until
securely fastened.
Step 6: Piggyback Plugs and Testing
PIGGYBACK PLUG CONNECTIONS
1) Plug the male end of the piggyback plug on the pump switch power
cable into the pre-installed female power receptacle inside the post (6A).
2) Plug the male end of the pump power cable into the female end of the
piggyback plug on the pump switch power cable (6B) from 6-1.
6A
Make sure all steps of the installation and wiring process is completed
and there is power to the product prior to testing.
STEP 1: TEST ALARM LEDs
Press the test pushbutton, lifetime pump run event counter statistic
should display, then alarm LEDs should illuminate while cycling between
red, green, blue, and off. The OLED screen should display a TESTING
(COLOR) event for respective LEDs after event statistic is displayed.
STEP 2: TEST PUMP AND PUMP FLOAT SWITCH
Make sure the tank has water to perform testing. Activate the pump
float switch, the blue LEDs should illuminate and the OLED screen
should display a PUMP RUN event and the pump amps are displayed.
STEP 3: RECOMMENDED SYSTEM SETTINGS
Alderon™ recommends changing the factory settings for: high amp
level, extended pump run time, and gallons per minute.
STEP 4: TEST WEEKLY
To ensure the product is functioning properly, test once a week.
(120VAC Example Shown)
6B
4) The third cable grip, on the left, has a cable grip divider for the
sensor wires. The high level alarm float switch black and white wires
are paired with the black and common sensor wires (1C and 1A).
The filter switch black and white wires are paired with the red and
common sensor wires (1B and 1A). After bringing in the cables, firmly
tighten the cable grip by twisting clockwise until securely fastened.
5) NEVER leave ground wire(s) exposed, use provided Wago
connector for wire termination.
Note: A sensor wire is connected to the terminal blocks on the remote
alarm panel and wired in pairs to the high level alarm float switch and filter
switch inside the enclosure of the Mini Power Post™ as described above.
The alarm panel provides remote notification of alarm conditions.
BLACK
WHITE/RED
GROUND
WAGO
1A
1B
1C
Step 7: Install Bottom Cover
Line up the bottom enclosure cover with the grooves (7A), then slide
directly upward (7B) until it meets the top of the enclosure so the screw
hole is lined up and replace the screw at the bottom of enclosure.
7A
Step 8: Backfill
Make sure all steps of the installation,
wiring, and testing are complete. Take
the dirt/soil removed and backfill the
area for the post, riser, and direct
burial power wiring.
Power Wiring
(steps 5-1 and 5-2)
WHITE
N/L2
BLACK
L1
L1
BLACK
BLACK
L1
N
WHITE/RED
G
Factory Wired
WAGO
Factory Wired
Field Wired
GROUND
Factory Wired
Factory Wired
Field Wired
Field Wired
Factory Wired
7B
Backfill
Area
Backfill
Area
Alarm Power
Pump Power
Factory Wired
L1
N
G