CALI alumLEDs ALS500T-RMW-HC Manual de instrucciones de instalación - Página 5
Navegue en línea o descargue pdf Manual de instrucciones de instalación para Luz exterior CALI alumLEDs ALS500T-RMW-HC. CALI alumLEDs ALS500T-RMW-HC 16 páginas.
También para CALI alumLEDs ALS500T-RMW-HC: Manual de instrucciones de instalación (16 páginas)
9
Mount luminaire to Rail Brackets by sliding luminaire with assembled Hanging
Bracket Arms into Rail Brackets. Ensure each Hanging Bracket rests at the
center of each Rail Bracket.
Note: All Hex Head Bolts must be vertical after mounting luminaire. If bolts are
crooked or slanted, the Hanging Bracket must be adjusted.
Slide luminaire with Hanging
Bracket Arms onto Rail Bracket
10
Secure connections between continuous runs using Connector Blocks after all
luminaires have been mounted.
Note: Refer to steps on page 12 for details.
11
Install Ceiling Trim after all runs have been mounted and connected.
Note: Follow the steps on page 13 to install Ceiling Trim.
12
After all luminaires are mounted, adjust height and levelness of each luminaire
by tightening or loosening hex nuts on Hanging Bracket assembly. Use a dummy
piece of drywall to perfect the height at which the luminaires will rest.
The drywall will be tucked into the gap between the Hard Ceiling Trim and the
concealed ceiling grid when hung.
Note: One person holds the luminaire and another person adjusts hex nuts.
Tighten hex nuts as needed
CALIFORNIA ACCENT LIGHTING, INC.
2820 E. Gretta Lane, Anaheim, CA 92806
ph. 800.921.CALI (2254) | fx. 714.535.7902 | [email protected] | calilighting.com
© CALI. All rights reserved. CALI reserves the right to make changes or withdraw specifications without prior notice.
Hard Ceiling Trim flush with
projected location of ceiling drywall
Ceiling Line
ALS500T-RMW-HC
Mounting (Hanging Bracket Assembly ) 2 of 2
13
Secure a tie wire to each Hanging Bracket Arm after luminaires are set in place.
Note: Refer to the diagrams on page 3 for details.
14
If applicable, position the driver in the center of luminaire and secure using set
screws (by others). Do not mount drivers between luminaires.
Note: Driver size and location of mounting holes may differ from below example.
15
Make wiring connections from driver to 1st PCB. Pull lead wires from luminaire
and make splice connections to lead wires from driver. Verify wiring diagram
before connecting.
16
Perform a continuity test before connecting luminaire to power source.
Refer to page 15 for continuity test step by step.
17
Verify driver wire colors from wiring diagram, then connect luminaires to power
source. Drivers used for this product vary. Always confirm wiring diagram from
driver installation instructions before connecting.
18
Apply mud to Wall Trim until completely covered and smooth. Allow to dry
completely before painting or sanding. Do not use pre-mixed mud compounds.
19
After all installation steps are complete and lighting is confirmed to be working,
install reflective film to runs.
Note: Follow the steps on page 14 to install reflective film.
INSTALLATION INSTRUCTIONS
Lead Wire
V-Groove Channel
5 / 20 / 2021 / Rev 3
Page 5 of 16