2.3 BURNER
A. Basis of Design Product: Subject to compliance with requirements, provide products as
listed:
1. Power Flame – Model:
B. Code Compliance: UL, CSD-1
C. Burner must be factory mounted and wired including burner control panel.
D. Light Package: Power On, Load Demand, Main Fuel, FSG Alarm
E. Quick Connect Wiring of Burner and Gas Train: Burner to include factory wired burner quick
connect wiring. This provides quick and easy removal of the burner and gas train for
applications when the burner may need to be shipped loose or removed for rigging
purposes. The quick connect system greatly reduces the time required for the installing
contractor to remount and make wiring connections.
F. Burner to include a Siemens LMV3 linkageless modulation system consisting of independent
servo motors to manage the air-fuel ratio. Burner also to include a Siemens RWF55 PID
controller and temperature sensor.
The use of linkage type or CAM type modulation is not acceptable.
G. Blower: Forward-curved centrifugal fan integral to burner, directly driven by motor.
H. Gas Train: Control devices shall comply with requirements in ASME CSD-1 and UL. Gas train
to include pilot shut-off valve, regulator, pilot solenoid valve, intermittent electric spark
pilot ignition with 100 percent main valve and pilot safety shutoff with electronic ultra violet
supervision of burner flame (flame rod not acceptable).
I.
Main Gas Train: Factory piped and wired (may be removed for shipment as a complete
assembly for protection), main gas regulator, main gas safety shut off valve, secondary gas
safety shut off valve, isolation valve(s) with test cock(s), high and low gas pressure switches.
2.4 SOURCE QUALITY CONTROL
A. Test and inspect factory-assembled boilers, before shipping according to ASME Boiler and
Pressure Vessel Code.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Before boiler installation, examine roughing-in for concrete equipment bases, anchor bolt
sizes and locations, and piping and electrical connections to verify actual locations, sizes,
and other conditions affecting boiler performance, maintenance, and operations.
1. Boiler locations on drawings are approximate. Determine exact locations before
roughing-in for piping and electrical connections and consult mechanical engineering
Project Manager for approval prior to proceeding.
with a minimum turndown of 10:1