Zanussi ZHC 95 ALU Manual de instrucciones - Página 11

Navegue en línea o descargue pdf Manual de instrucciones para Campana de ventilación Zanussi ZHC 95 ALU. Zanussi ZHC 95 ALU 20 páginas. Cooker hood
También para Zanussi ZHC 95 ALU: Manual de instrucciones (20 páginas), Manual de instrucciones (18 páginas)

Zanussi ZHC 95 ALU Manual de instrucciones
Please ensure that when the appliance is installed
it is easily accessible to an engineer in the event
of a breakdown.
All installation must comply with the local
authorities requirements for the discharge
of exhaust air.
Incorrect installation may affect the safety
of this cooker hood.
Installation Requirements
Before installation, check that the
wall to which the cooker hood is to
be fitted for electricity cables and
water and gas pipes.
This cooker hood is designed to be fixed to any rigid
vertical surface over a cooking area, and can be used
in the extraction (ducted to the outside) or re-
circulation (internal recycling) mode.
The installation work must be carried out by a qualified
electrician or competent person.
The manufacturer declines any responsibility for
damages due to incorrect installation of the cooker
hood or if the cooker hood is not installed in
compliance with relevant regulations controlling this
type of installation.
Before unpacking the cooker hood position the carton
with the arrows pointing upwards as illustrated on the
carton.

INSTALLING THE COOKER HOOD

The cooker hood is made up of the following
components:
1 No. Canopy C complete with controls and worktop
illumination.
1 No.Telescopic chimney stack A complete with
ducting fan unit.
1 No. Flange 120mm F
1 No. Venting grille G
1 No. Spigot R
1 No. Ducting conversion bend W
1 No. Support rod B
1 No. Fixing kit containing a wall bracket S to fix the
canopy hood, the cover and documentation.
S
F
G
R
W
B
11
A
C
S36_01