Aerco AM 399W Manual de aplicación - Página 6

Navegue en línea o descargue pdf Manual de aplicación para Caldera Aerco AM 399W. Aerco AM 399W 20 páginas. Gas-fired boilers and water heaters venting application
También para Aerco AM 399W: Manual de aplicación (8 páginas)

Aerco AM 399W Manual de aplicación
GF-146-V
TAG-0075_0B
1.3.4. OPTION 4: PVC/CPVC (Use Schedule 40 or thicker, Single-Wall,
Uninsulated Pipes)
When using Non-Metallic (Plastic) vent systems for Canadian installations, per CSA B149.1, use vent
systems that are certified to the Standard for Type BH Gas Venting Systems, ULC-S636. The plastic
components, primers and glues of the certified vent system must be from a single system
manufacturer and not inter-mixed with other manufacturers vent system parts.
1. PVC
ASTM F891
ASTM D2665
ASTM D1785
ASTM D2241
2. CPVC
ASTM D2846
ASTM F441
ASTM F442

1.4. FACTORY SUPPLIED INLET AND VENT CONNECTION COMPONENTS

All units are supplied with the appropriately sized PVC starter piece for venting. For starter pieces
intended for polypropylene or AL29-4C venting, contact the vent manufacturer directly.
Page 6 of 20
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288
AM Series Venting
Application Guide
AM1 04/08/2014