Armstrong Emech F2 Manual de instalación, uso y mantenimiento - Página 14

Navegue en línea o descargue pdf Manual de instalación, uso y mantenimiento para Unidad de control Armstrong Emech F2. Armstrong Emech F2 20 páginas. Steam water mixing valve

Armstrong Emech F2 Manual de instalación, uso y mantenimiento
Armstrong International
221 Armstrong Blvd., Three Rivers, Michigan, 49093 - USA
Phone (269) 279-3602 Toll Free (888) HOT-HOSE (468-4673)
14
Apply a light even coat of grease to the
spindle bearing surfaces and the O-rings
(Image 7).
Check the fit of the spindle in the bonnet
(Image 8). If the spindle fits, proceed to
Image 9.
Lightly grease both sides of the thrust washer
and place on the spindle. Place on the
needle roller bearing (Image 9) and apply
grease (approx 60% of the void space).
Lightly grease both sides of the second thrust
washer and place on the bearing.
Apply a light even coat of grease to the body/
bonnet seal O-ring and bonnet bore. Place
the O-ring around the perimeter of the bonnet
(Image 1).
Align the discs with the spindle on top before
gently lowering the bonnet over the spindle
down to the body (Image 11).
Secure down the bonnet with the allen head
cap screws using an allen wrench (Image
12).
Check the torque of the bolts to the range
indicated in table 4.1. (See table 4.2 page
15).
Rotate the spindle one full rotation. The
movement should be smooth and even with
no variation in torque (Image 13).
Lubricate inside and outside of the gland
nut, paying particular attention to the thread.
Insert the O-ring in the gland nut and then the
external O-ring (Image 114).
Continued.....
Designs, materials, weights and performance ratings are
approximate and subject to change without notice. Visit
armstronginternational.com/emech for up-to-date information.