Acorn Safety S0950-AS Instrucciones de instalación, uso y mantenimiento - Página 2

Navegue en línea o descargue pdf Instrucciones de instalación, uso y mantenimiento para Productos de fontanería Acorn Safety S0950-AS. Acorn Safety S0950-AS 5 páginas. Eye/facewash

Installation & Operation Manual

PRELIMINARY STEPS

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. all employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
6 1 8 "
(156)
13 3 4 "
(349)
4 1 2 "
(108)
NOTE:
1.
2.
BETWEEN 33" [385] AND 45" [1143] ABOVE
FLOOR.
3.
RIGHT HAND MODEL SHOWN. LEFT HAND
MODELS AVAILABLE.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-402-001
3 5 8 "
(92)
90°
Ø2 1 4 "
(57)
1 7 8 "
(48)
1 1 2 "
(38)
ALL DIMENSIONS ARE IN INCHES [MM].
ANSI Z358.1 REQUIRES NOZZLES TO BE
3 9 16 "
(90)
1/2" NPT SUPPLY
Page 2 of 5
3
4 "
Ø 1 4 "
(19)
(6.4)
Ø1 1 8 "
(28.5)
MOUNTING DETAIL
Revised: 08/16/19