3D Systems ProJet 7000 Instrucciones de trabajo - Página 6

Navegue en línea o descargue pdf Instrucciones de trabajo para Impresoras 3D 3D Systems ProJet 7000. 3D Systems ProJet 7000 7 páginas. Manual resin stirring procedure

3D Systems ProJet 7000 Instrucciones de trabajo
Title: Work Instruction – ProJet 6000/7000 Manual Resin Stirring Procedure
Doc: 283584-00
Rev: A
• Close the machine door.
• When alerted, select "Yes" to turn the power back on.
• Go to the "Advanced" page, select "Elevator/Leveler," and select
9
"Offload."
• Wait for the elevator to move to the offload position.
• Open the machine door and install a clean platform.
• Close the machine door.
• When alerted, select "Yes" to turn the power back on.
• Select "Start." Wait for the elevator to move to the start position.
• In the "Elevator/Leveler" menu, select "Level" to level the resin.
10
• When the resin level reading reaches roughly 31.000, select "Stop" to stop leveling.
• In the "Elevator/Leveler" menu, select "Home."
• Wait for the elevator to home.
• Wait for large bubbles and micro-bubbles to disappear.
• The system is now ready for part building.
3D SYSTEMS CONFIDENTIAL
Description: ProJet 6000 and 7000
Date: 9/11/14
Page: 6 of 7