Aerial-51 ALT-512 Instrucciones de montaje - Página 2
Navegue en línea o descargue pdf Instrucciones de montaje para Transceptor Aerial-51 ALT-512. Aerial-51 ALT-512 3 páginas. Qrp transceiver
Aerial-51 ALT-512 QRP TRANSCEIVER 'EZee-KIT' ASSEMBLY INSTRUCTIONS
Step 2: Mount the Right Side Plastic Foot as follows:
Step 3: Mount the Volume Control knob
• Rotate the volume control shaft
full Counter-Clockwise (CCW).
• With the white line on the knob at
7 o'clock, place the knob over the
shaft and push it all the way
down.
• When seated, it should point to 7
o'clock at minimum volume.
15-MAY-2019
2