ClearMirror Studio Series Manual de instrucciones de instalación - Página 3
Navegue en línea o descargue pdf Manual de instrucciones de instalación para Mobiliario interior ClearMirror Studio Series. ClearMirror Studio Series 6 páginas. Handcrafted, fog-free vanity mirrors
WARNING: This stage requires a qualified electrician and conformance with both the National
Electrical Code and local building codes. Turn off the power to the circuit connected to the light
fixture at the disconnect means. Failure to do so could result in death or serious injury.
MEASURE FOR CLEARMIRROR INSTALLATION
With mirror removed, mark junction box location on the wall where the sink's center meets the
top edge of the ClearMirror heater. Normally 2 inches higher than the tallest user as shown in
Figure 1.
INSTALL ELECTRICAL BOX
Shut off power to the circuit where heater is to be connected at the disconnect means.
• Use a keyhole saw or drywall router to cut a tight fit for the remodelers' box.
• Install remodeler's electrical junction box and tighten screws until junction box is secure in
the opening.
WARNING: Do not use any fuel-based cleaners.
Figure 1. Location of ClearMirror wire leads and installing the junction box (Back View)
Figure 1. Location of ClearMirror wire leads and installing the junction box (Back View)
Studs
Junction Box
Finished Floor