Section E2 - Rafter Setup (without ground posts)
Step 1: Stand up one of your end rafters (one of those with the horizontal chord). Secure it to an
existing structure if possible so that it is plumb. If you donʼt have an existing structure, you can
use some 2x4s as shown tied with rope:
Step 2: Insert the plain end of a 99" swaged purlin into the cross coupling at the peak of the end
rafter and tighten the bolts. The end of the purlin should be flush with the outside surface of the
coupling or the rough end of the purlin could damage the cover when it is installed later. Have
an assistant hold the ridge purlin horizontal until the next step is completed.
Step 3: Stand up the next rafter (an inside rafter) and slide it onto the ridge purlin. Position it exactly
8 feet from the end rafter and tighten the coupling. Your structure should stand on its own now.
Step 4: Add swaged 99" purlins at the tops of the legs just below the bends.
Step 5: Continue to add rafters (at 8' spacing) and purlin sections until your shelter is complete and
you've finished with the other end rafter. The last purlin sections should be unswaged sections
that are the correct length so the purlin assemblies are the same length as your shelter.
Step 6: Recheck that every rafter is standing up straight (plumb) and there is 8' between them when
measured at the couplings.
Step 7: When all rafters are straight and plumb, tighten all the coupling bolts.
Step 8: If this is a permanent installation, we recommend that you install a Tek screw at each purlin
joint to secure the connection.