Clearwater Spas CLEAR A-400 Manual del usuario - Página 10
Navegue en línea o descargue pdf Manual del usuario para Accesorios para balnearios Clearwater Spas CLEAR A-400. Clearwater Spas CLEAR A-400 20 páginas.
Caution: This system must be grounded while in use to protect
the operator from electric shock. If it should malfunction or break
down, grounding provides a path of least resistance for electric current
to reduce the risk of electric shock. This system is equipped with
a cord having an equipment-grounding conductor and grounding
plug. The plug must be plugged into an appropriate outlet that is
properly installed and grounded in accordance with all local codes and
ordinances.
Electrical Requirements
The electrical requirements are a 120 or 240-volt 60 Hz, AC only, 15+
AMP protected electrical supply. Please check the label on the back of
the controller for voltage requirement. The retailer and manufacturer
cannot accept any liability for damage to the equipment or personal
injury resulting from failure to observe the correct electrical connection
procedures.
CLEAR can be installed in under 30 minutes. The PVC tee is usually
installed in the spa circulation system after the pump and heater.
However, you may install the tee anywhere in the filtration system that it
fits. Please follow these instructions:
1. Ensure hardness, alkalinity, pH and TDS are within acceptable levels
(see maintenance section).
2. Excessive amounts of algae and bacteria should be controlled prior
to start-up.
3. Turn off the pump.
4. Plan the placement of the tee and controller so that there is
adequate cable length for the cell to reach the controller and the
controller to reach the power source. A qualified electrician can
extend the mineral cell cable if required using standard 18/3 cable.
5. Drain the water pipe in which you have chosen to install the tee.
6. Cut out a 2.5" section of the run of pipe where you have chosen to
install the tee.
10 | User Guide