AIMS Power PV6X250RACK Manual de instalación - Página 9

Navegue en línea o descargue pdf Manual de instalación para Inversor AIMS Power PV6X250RACK. AIMS Power PV6X250RACK 16 páginas. Ground mounting system

AIMS Power PV6X250RACK Manual de instalación

Installation Steps

1. Unfold the pre-assembled leg and connecting upright. Fasten the base of the legs to the attached
anchor bolts. Tighten all anchor bolts to secure leg and upright.
9
www. A imscorp.net