Alvarado MSGX Manual de instrucciones de instalación y mantenimiento - Página 6

Navegue en línea o descargue pdf Manual de instrucciones de instalación y mantenimiento para Cercas y puertas Alvarado MSGX. Alvarado MSGX 20 páginas. Full height maximum security gate

Tools Required

Heavy Duty Drill or Rotary Hammer
5/8" Concrete Drill Bit
Torque Wrench (ft-lbs)
Shop Vac

Parts List

Gate in frame
This installation guide
Power supply (for select models)
Push bar or handle (optional)

Installation Overview

The overall steps to correctly install the Maximum Security Pedestrian Gate are below:
1) Determine gate location; taking into account power and activation wiring stub requirements (if applicable).
2) Anchor the gate and attach the closing arm hinge.
3) Connect activation wiring (if applicable).
4) Connect low-voltage power (if applicable).

Slab Requirements

The must be installed on a level concrete pad with a minimum thickness of 4 inches.
WARNING
DO NOT INSTALL ON ASPHALT.
Page 6
For Assistance: [email protected] +1 (909) 591-8431
MSG Installation and Maintenance Instructions
Tape Measure
Chalk Line
Safety Glasses
Anchor package:
3/8" anchors (2" length - Qty 8)
3/8-16 x 2 1/2" HHSC (Qty 8)
3/8" Flat washers (Qty 8)
PUD1201R5-0