aion RUNOFFGROOVE SUPREAUX DEUX Manual - Página 7
Navegue en línea o descargue pdf Manual para Equipos de grabación aion RUNOFFGROOVE SUPREAUX DEUX. aion RUNOFFGROOVE SUPREAUX DEUX 10 páginas.
DRILL TEMPLATE
Cut out this drill template, fold the edges and tape it to the enclosure. Before drilling, it's recommended
to first use a center punch for each of the holes to help guide the drill bit.
Ensure that this template is printed at 100% or "Actual Size". You can double-check this by measuring
the scale on the printed page.
Top jack layout assumes the use of closed-frame jacks like the
open-frame jacks, please refer to the Open-Frame Jack Drill Template for the top side.
LED hole drill size assumes the use of a
size accordingly if using something different, such as a 3mm bezel, a plastic bezel, or just a plain LED.
INCH
0
1
CM
0
1
2
RUNOFFGROOVE SUPREAUX DEUX
5mm LED
bezel, available from several parts suppliers. Adjust
125B
0.625"
0.625"
ø3/8"
ø1/2"
OUT
DC
VOLUME
x: -0.65, y: +1.71
ø9/32"
TONE
x: 0, y: +0.66
ø9/32"
CENTER (0,0)
LED
FOOTSWITCH
x: -0.775, y: -1.20
x: 0, y: -1.20
ø5/16"
ø15/32"
Switchcraft
111X. If you'd rather use
ø3/8"
IN
GAIN
x: 0.65, y: +1.71
ø9/32"
BOTTOM
x: +0.85, y: +0.66
ø1/4"
7