DO HEATING Rebo Instrucciones de fijación - Página 2
Navegue en línea o descargue pdf Instrucciones de fijación para Sanitarios DO HEATING Rebo. DO HEATING Rebo 8 páginas. Towel rail
Specifications
PLEASE NOTE: That in accordance with Part L1 2006 of the Building Regulations and BS7593:1992
code of practice for the treatment of hot water and central heating systems, we recommend
flushing the heating system before installation of new radiators and then adding the correct
quantity and type of inhibitor for use with the radiator and system to prevent corrosion. Damage
caused to systems not protected by a suitable inhibitor will not be covered by the manufacturer
warranty. It is the responsibility of the installer to ensure the correct use and suitability of the
fixings provided. No liability for costs or damages arising from failure to do so can be accepted.
Vent on back
W
H
F/R
H80 – 5 tubes
W
H
H120 – 7 tubes
Technical Information
Standard connections: ½"
F = Flow
R = Return
Wall to front face = 90-125mm
Wall to pipe centre = 65-100mm
Technical Specifications
Materials: Stainless Steel
Connections: ½" Flow and Return
Test pressure: 7 Bar
Testing authority: EN442
Max operation pressure: 4 Bar
Max working temperature: 95c
These can be cleaned using a soft
damp cloth with a non-abrasive
cleaning product.