Dodge Tigear-2 Manual de instrucciones - Página 4
Navegue en línea o descargue pdf Manual de instrucciones para Equipamiento industrial Dodge Tigear-2. Dodge Tigear-2 8 páginas. Accessory kit
También para Dodge Tigear-2: Manual de instrucciones (2 páginas)
TRANSITION KIT
Position the transition base on the reducer with the counter
bored holes facing away from the reducer. Insert the supplied
socket head screws and lock washers and tighten the screws to
the tightening torque values listed in the below table. Position
the detachable base on the transition base (if used) and insert
the hex head screws. Tighten the screws to the tightening torque
values listed in the table below.
Reducers
2326
Transition
3/8-16
Base to
Reducer
Screw Size
Socket Head
Screw
Tightening
Torque
(ft-lb)
Detachable
3/8-16
Base to
Transition
Base Screw
Size
Hex Head
Screw
Tightening
Torque
(ft-lb)
2630
3035
3/8-16
7/16-14
30
30
7/16-14
7/16-14
30
48
J-MOUNT BASE KIT
Install the J-mount brackets on the reducer. Insert and hand
tighten the supplied screws and lock washers. Install the reducer
in the application and insert and hand tighten the foundation
bolts. Tighten the J-mount bolts and lock washers on the reducer
to the values listed below. Tighten the foundation bolts.
Reducer
Size
13
15
17
20
23
26
48
30
35
48
4
Tightening
Bolt or Screw Size
1/4-20
1/4-20
5/16-18
3/8-16
3/8-16
3/8-16
7/16-14
7/16-14
Torque
(ft-lb)
8
8
17
30
30
30
48
48
MN1661