Akrobat ORBIT INGROUND Manual de instalación y uso - Página 5

Navegue en línea o descargue pdf Manual de instalación y uso para Deportes y aire libre Akrobat ORBIT INGROUND. Akrobat ORBIT INGROUND 16 páginas. 8 ft, 10 ft, 12 ft, 14 ft

Akrobat ORBIT INGROUND Manual de instalación y uso

3. ASSEMBLY AND INSTALLATION

We recommend at least two people to assemble the trampoline. Use gloves to protect your hands from pinch points and
sharp points during assembly. Do not apply excessive force during assembly that will cause damage to the product.
TOOLS: You will need a cross-head screwdriver for the retaining wall PVC panels.

Assembling the frame

Lay the frame sections (Part A) into a circle
1
with the spring holes facing upwards. Push
all sections together until all are fully mated
together.
Please note: On the long sides, the frame will appear to bow outwards - this is by design. When the springs are attached
the frame will pull inwards, but always have a slide outward bow.
Important: all trampoline sizes are approximate and can be up to +/- 3" (2.5 cm) different to those that we
publish.
Fitting the mat and installing the springs
Lay the mat flat inside the frame. Make sure the
2
logo is facing upwards. In order to make the
installation of the jumping mat easier, locate the
four rings in the 12, 3, 6 and 9 o'clock position
directly opposite each other and attach four
springs on these locations first. Then continue by
attaching springs to every eighth ring, followed
by every fourth and so on until all springs are
attached.
At first, it may look like the mat won't fit, it will
however stretch to the correct size when you
finish attaching all springs.
After joining all the frame parts into a circle, install the
trampoline legs into the sockets on the frame.
AKROBAT HINT:
Springs can be hard to attach, you will need a little force. Help
yourself by using one spring to pull another towards the frame
holes. Do not forget to wear gloves!
Important: Be sure all spring hooks
are well attached to the frame.
5