BlueSky Mast 350G XL Series Hoja de referencia rápida - Página 8
Navegue en línea o descargue pdf Hoja de referencia rápida para Sistemas de elevación BlueSky Mast 350G XL Series. BlueSky Mast 350G XL Series 10 páginas.
También para BlueSky Mast 350G XL Series: Referencia rápida (10 páginas)

19
Remove the mast pole.
24
Pull in all the slack, wind and
stow the four secondary guy
ropes.
29
Use the crow bar to remove both
stakes from the tilt leg base plate.
34
Release the ball stop from the
holder and wind up the cable on
the winch.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2016 Allendale LLC All Rights Reserved
350G XL - Lift Series
Quick Reference Sheet - Primary & Secondary Guying
Lowering / Recovery
20
Raise the lift base plate until it
nests firmly into the next mast
pole.
25
Continue lowering the mast until
you reach the primary guy ring.
30
Now remove the single stake on
the right side of each of the re-
maining base plates.
35
Remove and stow the winch
handle.
21
Adjust the four primary guy ropes
and make sure the mast is
straight and perpendicular.
26
Remove the primary guy ropes
and pull the pin to release the
primary guy ring.
31
Hold the mounting pole, loosen
the turn knob on the tilt leg and
SLOWLY kneel the tripod.
36
Remove and stow the lift base
plate.
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
22
Repeat this process for the next
couple poles or until
the blue
secondary guy ring is within reach.
27
Pull in all the slack, wind and stow
the four primary guy ropes.
32
Remove all devices and accesso-
ries from the mounting pole.
37
Release the cam lock and remove
and stow the mounting pole.
Lock the cam lock.
23
Remove the secondary guy ropes
and release the cam lock on the
secondary guy ring.
28
Use the hammer to tap the guy
stakes side to side to loosen.
Stow the hammer and stakes.
33
Remove primary and secondary
guy rings and stow them with guy
ropes.
38
Collapse the two extended tripod
legs.