Flocca Flow Manuel d'entretien rapide

Parcourez en ligne ou téléchargez le pdf Manuel d'entretien rapide pour {nom_de_la_catégorie} Flocca Flow. Flocca Flow 2 pages. The ultrasonic meter measures the depth of flow entering the basin forebay through a defined size pipe or channel.

Flocca Flow Manuel d'entretien rapide
Flocca Flow - Quick Maintenance Guide
PERFORM WEEKLY OR PRIOR TO RAINFALL
1. SOLAR PANEL
»
Check solar panel faces north
»
Ensure no shadow on panel as this can significantly effect
the solar panel efficiency
»
Check cable attached on underside of Flocca unit
»
Wipe down glass panels to ensure free of dust
2. INSTALL OUTLET ASSEMBLY
»
Check IBC level is sufficient for next rainfall event
»
Top up or replace IBC if needed
»
Turn elbows down to allow IBC to drain when nearly empty
»
Replace flow meter or solenoid if these are more than 12 months
old or 6 months on high-use sites
3. CHECK ULTRASONIC SENSOR AND INLET
»
Check that ultrasonic is mounted securely in pipe / over channel
»
Tighten the nuts if needed
»
Check that ultrasonic cable is attached to correct socket
»
Make sure that pipe and channel are clear of any debris and sediment
4. TURN ON FLOCCA
»
Open external door with key
»
Check unit is switched on
5. CHECK MAIN SCREEN
»
Any recent flow and dosing data will be displayed in the statistics
»
Check if there is any dose pending (there could be a very small
negative amount, like -0.050, this is OK)
»
If there is an alarm showing, go to System Info – Alarms to clear by
unticking the box
»
The most common cause of an alarm is insufficient chemical in the
IBC, which causes the system to not register any flow through the
outlet. Refer to manual for further info on clearing alarms
flocca.com.au
Flocca Flow - Quick Maintenance Guide
1