Barmesa Pumps 4BSE452DS Manuel d'installation, d'utilisation et d'entretien - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel d'installation, d'utilisation et d'entretien pour {nom_de_la_catégorie} Barmesa Pumps 4BSE452DS. Barmesa Pumps 4BSE452DS 14 pages. Submersible solids handling pumps
Impeller and Volute - Install impeller
(29) by appling a thin film of oil to
motor shaft and slide impeller
straight onto shaft, keeping keyways
lined up. Drive key (13) into keyway.
Locate washer, apply thread lock
primer (such as Loctite® Primer T), let
set per manufacturer's directions.
Apply thread locking compound to
threads on cap screw, and thread into
shaft and torque to 35 ft/lbs.
Place gasket (32) on volute and install
impeller and motor assembly over
studs and onto volute (33). Apply
thread locking compound to threads
of studs (25) and thread nuts (26)
onto studs and torque to 24 ft/lbs.
Check
for
binding
impeller. Clearance between the
impeller and volute should be
approximately 0.012 inch.
barmesapumps.com
RUN
START
B
L1
L2
RUN
SINGLE PHASE 230 VOLT AC
Capacitor/Relay Pack For Control Panels
SINGLE-PHASE 230V AC
Cable
Green
Black
Red
White
by
rotating
THREE-PHASE 230V AC
G L1
G T1 T7 T2 T8 T3 T9 T4 T5 T6
SR
2
5
1
Cable
Green
Black
Red
White
R
W
START
COMMON
G L1 L2
L3
G T1 T2
T3
MOTOR LEADS
Figure 5
Motor Lead Number
Green
1
2
3
L2
L3
MOTOR LEADS
Figure 5
Motor Lead Number
Green
1 and 7
2 and 8
3 and 9
4, 5 and 6 together
Service
THREE-PHASE 460V AC
G
G
L1
L2 L3
G
T1
T2 T3 T4 T7 T5 T8 T6 T9
MOTOR LEADS
Figure 5
Cable
Motor Lead Number
Green
Green
Black
1
Red
2
White
3
4 and 7 together
5 and 8 together
6 and 9 together
CONTROL CABLE
TEMPERATURE
MOISTURE
SENSOR
SENSOR
G
L1 L2
L3 L4
G
P1 P2
S1 S2
THERMOSTAT
N/C
Figure 5
Control Cable
Lead Number
Black
L1 (Temperature)
White
L2 (Temperature)
Red
L3 (Moisture)
Orange
L4 (Moisture)
Green
Ground
N/O
08