American Standard Green Tea 3571 Manuel d'installation - Page 12

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} American Standard Green Tea 3571. American Standard Green Tea 3571 17 pages. Bath waste and overflow with toe tapper drain plug & deck mount bath filler
Également pour American Standard Green Tea 3571 : Manuel d'installation et d'utilisation (14 pages)

American Standard Green Tea 3571 Manuel d'installation
DRAIN CONNECTION
12. Apply PVC cement to Horizontal Drain Pipe PVC and assemble to 0 degree elbow.
13. Dry fit Vertical Drain Pipe PVC into overflow assembly, then insert into elbow, WITHOUT PVC GLUE to align drain and
overflow to bath. Mark overflow female coupling as shown in photo M.
14. Test fit and trim pipe as required to get overflow drain into center of overflow hole BEFORE GLUING vertical pipe into
0 degree elbow, as shown in photos N-1 and N-2.
N-1.
15. Apply PVC cement to Vertical Drain Pipe sub-assembly and assemble per re-aligned marks from step 13.
16. Disassemble overflow wedge gasket and chrome overflow retainer as shown in photo O.
17. Place overflow wedge gasket onto plastic overflow pipe flange with round raised rib surface contacting flange
as shown in photo P.
754063-100 Rev. B
continued...
M.
O.
P.
N-2.
1