Da-Lite 29534 Manuel d'instruction - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} Da-Lite 29534. Da-Lite 29534 14 pages.

Da-Lite 29534 Manuel d'instruction
Installation (continued)
7. Mount the first lifting bracket (D) in the top section of the wall
opening behind the T-track (B). Measure 2⅛" from the back
(projector side) of the T-track (B) to the back edge of the
lifting bracket (D) and ½" from the edge of the opening to
position the bracket correctly. Use 1/4" x 1" lag screws to
attach the bracket (See Figure 4).
NOTE: Lifting brackets (D) must be parallel to T-track. When
installed in the correct orientation, the bottom lip of the lifting
bracket (D) will be the side closest to the T-track (B).
8. Repeat for the second lifting bracket (D) at the top section of
the screen in the opposite corner (See Figure 4).
Step 8
8
Step 9
Step 7
9. Position the third lifting bracket (D) 2⅛" from the back of the
T-track (B) in the center of the top section of the wall opening
and mount with 1/4"X 1" lag screws (See Figure 4).
NOTE: After completing this step, there should be three lifting
brackets (D) mounted into the top section of the wall opening
behind the T-track (B). Check that these brackets are secure.
They will be used to guide the screen surface into place and
support its weight until the T-track (B) and screen frame are
attached to each other.
WARNING: After completing this step, do not proceed
further in the instructions until the screen surface has
remained in a flat, unrolled state for at least 4 hours.
2⅛"
T-Track
Figure 4
Lifting Bracket
1/2"