Da-Lite Dual Masking Electrol Manuel d'instruction - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} Da-Lite Dual Masking Electrol. Da-Lite Dual Masking Electrol 8 pages.

Pre-Installation

1.
Carefully unpack screen.
2. Make sure to recheck measurements of screen
location before installation.
3. Remove center support brackets (on 8' and wider screens only),
reverse brackets and reinstall flush with the top of the box
Drywall Screw
Access Panel
Machine Screw
Installation
1.
Install screen by raising unit into position between joists at
one end only. Install one lag screw in each mounting bracket.
2. Level unit lengthwise with a carpenter's level and plumb level.
Secure opposite end.
CAUTION! Do not seal in until screen has been secured in
position and properly tested for satisfactory operation.
ATTENTION! Ne fixez pas l'écran jusqu'à ce qu'il ait été
correctement mis en place et qu'il fonctionne
convenablement.
3. Detach access panel by removing screws, see figure 1.
4. Remove junction box cover plate.
5. Install electrical hook up that applies to your unit. Make sure to
review your electrical installation checklist and wiring diagrams
(included) for either 120 volt switch, 220/240 volt switch or DRC
low voltage control.
NOTE: Must be installed in accordance with the requirements of
the Local Building Codes, the Canadian Electrical Code (CEC), CAN/
CSA C22.1 and the National Electric Code (NEC), NFPA 70.
CAUTION! Do not cut tape on fabric with knife or any sharp
tool. Pull orange string.
ATTENTION! Ne coupez pas le ruban adhésif sur la toile avec
un couteau ou un outil tranchant. Tirez sur le cordon orange.
Figure 1
Adjustment
Mask Motor
Knob "Down"
Adjustment
Knob "Up"
Screen Motor
Slats
6. Carefully remove wood boards securing mask surface to case.
7.
Carefully remove tape strips securing picture surface around roller.
Slats should move freely (Fig. 2).
8. Test installation by carefully running picture and mask surfaces up
and down several times. Be prepared to stop screen. Standard
Duty Cycle: 1 MIN. ON / 3 MIN. OFF.
9. Run the picture surface upward. When the picture surface is fully
up the limit switch (in the motor) is tripped and the motor shuts off.
10. Test the mask surface the same as testing the picture surface. The
mask will start down off the front of the roller, travel completely
down past the bottom of the viewing surface, then "step back"
against the viewing surface to eliminate shadowing by rolling up
the back side of the roller. Do not adjust the limits to change this
feature.
11. Check for satisfactory condition by operating screen a few times.
Reinstall access panel.
Mask Surface
Tape Strips
Picture Surface
Figure 2
3