Connection of the KNX bus line
The connection of the KNX bus line is made with the ter-
minal block (black/red) included in delivery and inserted
into the slot of the housing.
Characteristics of the KNX terminal block
• spring clamping of conductors
• 4 seats for conductors for each polarity
• terminal suitable for KNX bus cable with single-wire
conductors and diameter between 0.6 and 0.8 mm
• recommended wire stripping approx. 5 mm
• color codifi cation: red = + (positive) bus conductor,
black = – (negative) bus conductor
Warning! In order to supply the KNX bus lines use
only KNX bus power supplies (e.g. ekinex EK-AB1-
!
TP or EK-AG1-TP). The use of other power supplies
can compromise the communication and damage
the devices connected to the bus.
KNX
bus
-
+
Warning! The electrical connection of the device
can be carried out only by qualifi ed personnel. The
!
incorrect installation may result in electric shock or
fi re. Before making the electrical connections, make
sure the power supply has been turned off .
Confi guration and commissioning
Confi guration and commissioning of the device require
the use of the ETS
®
(Engineering Tool Software) program
V4 or later releases. These activities must be carried out
according to the design of the building automation system
done by a qualifi ed planner.
Note. The confi guration and commissioning of KNX
i
devices require specialized skills. To acquire these
skills, you should attend the workshops at KNX cer-
tifi ed training centers.
Confi guration
For the confi guration of the device parameters the corre-
sponding application program or the whole ekinex
duct database must be loaded in the ETS program. For
detailed information on confi guration options, refer to the
application manual of the device available on the website
www.ekinex.com.
Product
Application program
code
(## = release)
EK-E12-TP
APEKE12TP##.knxprod
pro-
®
Communica-
Group
tion objects
adresses
(nr. max)
(nr. max)
222
222
Commissioning
For commissioning the device the following activities are
required:
• make the electrical connections as described above;
• turn on the bus power supply;
• switch the device operation to the programming mode
by pressing the programming pushbutton located on
the front side of the housing. In this mode of operation,
the programming LED is turned on;
• download into the device the physical address and the
confi guration with the ETS
At the end of the download the operation of the device
automatically returns to normal mode; in this mode the
programming LED is turned off . Now the bus device is
programmed and ready for use.
Dimensions [mm]
81
24
13
11
71 Serie pushbutton for
mounting without frame ('NF
series), completed with rockers
and plate EK-PQS-...
4
program.
®
21
13
9
24
13
11
71 Serie pushbutton for
mounting with frame of Form
or Flank series, completed with