DoorHan SLIDING-2100 Manuel d'installation et d'utilisation - Page 9

Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} DoorHan SLIDING-2100. DoorHan SLIDING-2100 12 pages. Drive
Également pour DoorHan SLIDING-2100 : Manuel d'installation et d'utilisation (16 pages), Manuel d'installation et d'utilisation (12 pages)

DoorHan SLIDING-2100 Manuel d'installation et d'utilisation
The description of sockets of electric connections.
~220 (N, L, PE) the socket on the block serves for connection to the block of pressure of a food
pe: earth connection
n: a Food (neutral)
l: a Food (phase)
MOTOR (N, L1, L2) the socket on the block serves for connection to the electric motor block
LAMP the socket on the block serves for connection of an alarm lamp 230V, max. 40Wт.
Works at any movement of a cloth of gate. the lamp blinks with the period = 0.5-1 seconds
Further contacts of the low-voltage socket intended for connection of accessories are described.
1. START – a command "Complete opening" (n.o.)
short circuit of contacts of the system connected to this plug, leads to operation of the block of management on complete opening and-or
closing of gate (the exact logic of work depends on switch dip1 position).
dip1 - off. Commands in a cycle mode - open-stop-Close-stop are produced.
dip1 - on. Commands in a mode - open-Close-stop-open (at the opening the stop is not provided) are produced
after the first inclusion of an electricity the first command start leads to movement of gate on opening.
If from the first command start of a collar have started to move on closing, it is necessary to change position of switch dip3 answering for an
opening direction.
Command start is perceived by the management block through the period of time equal ~1-2 sec after its previous receipt on an input of the
block.
For connection of several systems, it is necessary normally opened no. Contacts of these systems to connect in parallel.
2. Ped - command Pedestrian (1 meter opening) (N.O.)
dip2 - off. Command ped leads to opening of gate approximately on 1 m. repeated command ped leads to closing of gate. If after a command
ped command start follows, the management block produces a command on complete opening of gate. Command ped at dip2-off is fulfilled
only in the closed position of gate, and as at its repeated giving on an input after opening on 1м.
dip2 - on. separate management of a drive is realised, i.e. Command start opens gate, ped - closes.
For connection of several systems, it is necessary normally opened no Contacts of these systems to connect in parallel.
3. SW OP / SW CL - signals from trailer switches of extreme positions of a cloth of gate.
operation (contact disconnection) концевика sW op / sW Cl means that the cloth of gate is in extreme opened / the closed
position and the further movement in the same direction is forbidden.
4. Photo Cl - contacts of connection of safety controls on closing (n.C.). appointment of the given connections - protection of a cloth of gate
at the close. operation of systems leads to immediate reversive movement of a cloth of gate before complete opening. operation of the systems
connected to these plugs, does not render any influence on work during opening of gate.
If gate are opened also the gauges connected to given plugs, have worked, it will prevent movement of gate on closing.
For connection of several systems with Н.З. Contacts, it is necessary to connect contacts of these systems consistently.
the note: If no systems are connected to the given plugs, it is necessary to establish a crosspiece between
Contact plugs "ph Cl" and "-" (fig. see).
5. Photo Op - contacts of connection of safety controls on opening (n.C.). appointment of the given connections - protection of a cloth of gate
at opening. operation of systems leads to an immediate stop of movement. operation of the systems connected to these plugs, does not render any
influence on work in a lock-up of gate. If gate are closed also the gauges connected to given plugs, have worked, it will prevent movement of gate
on opening. For connection of several systems with Н.З. Contacts,
It is necessary to connect contacts of these systems consistently.
the note: If no systems are connected to the given plugs, it is necessary to establish a crosspiece between the contact
plugs "ph op" and "-" (fig. see).
6. EMRG – contact for connection of systems of an emergency stop (n.C.). appointment of the given connections - protection of a cloth of gate.
at the close and opening. any logic of work of the block of management on a signal from these systems in the course of opening and closing of
gate provides an immediate stop of movement of gate. If gate are at rest and the gauges connected to given plugs, have worked, it will prevent any
movement of gate. For connection of several systems with Н.З. Contacts, it is necessary to connect contacts of these systems consistently.
The note: If no systems are connected to the given plugs, it is necessary to establish a crosspiece between the contact
Plugs EMRG (the Fig. see).
24V dC - plugs of an exit from the transformer of a food 24 In a direct current, макс. load 600 мА.
ATTENTION: at change of position of dIp-switches or mechanical regulators it is necessary to switch off and again to include pressure of a food
of a drive. otherwise change of options will not occur.
Description Dip - switches
dip1 - the mode of operation. at switched off dip1 during opening of gate command start is not perceived (on/off)
dip2 - separate management. at included dip2 separate management at which the system connected to plug start sends a command on
opening, and the system connected to plug ped - a command on closing of gate (on/off) is realised.
dip3 - a direction of opening of a drive. Included dip3 corresponds to position of a drive to the right of an aperture, switched off dip3 - a drive
to the left of an aperture.
dip4 - reserve. It is not used.
9
I n s t a l l a t I o n a n d o p e r a t I n g M a n u a l o p e r a t o r s l I d I n g - 1 3 0 0 / 2 1 0 0
PRoGRAMMInG
9