Astralpool SLX Manuel d'installation et d'utilisation - Page 3
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} Astralpool SLX. Astralpool SLX 6 pages. Underwater niche lights for fibreglass pools
Également pour Astralpool SLX : Instructions détaillées (6 pages), Manuel de démarrage rapide (4 pages), Manuel d'instructions d'installation (7 pages), Instructions d'installation (4 pages)
Installation Instructions
Please note that the first few steps of these instruction must be performed before the concrete is poured.
Once poured, the remainder of the steps can then be taken.
1. Using soft wire or cable ties, attach the niche (item
inlet should be directed upwards as depicted. For servicing and practical reasons, the light should not
be installed deeper than 450mm below the water line. Install the niche so its front face will be flush
with the inside face of the finished concrete wall.
Install flush with future concrete
wall
Steel reinforcement
bars
Secure niche to steel bars
with wire or cable ties
2. Glue a length of 25mm electrical conduit to the niche conduit socket using PVC solvent cement.
Ensure the conduit extends above the water level of the pool. If a draw wire is not being used, the
cable (item 20348 or 20344) must be fitted simultaneously with the conduit installation. Starting at the
niche, run the cable though the conduit to the power supply. Leave 1m of cable surplus inside the
niche, complete with the end of the cable with the plug, and coil up inside the niche until ready to fit
the light. Ensure the cable gland inside the niche is fully tightened around the cable.
Inst.375 Astral Pool CONCRETEInstructions V10.15
75810-C)
25mm electrical conduit
installed to inlet
Niche
to the steel reinforcement. The conduit
Install flush with future concrete wall
Future concrete
wall
3