Akw Option ZW Instructions d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions d'installation pour {nom_de_la_catégorie} Akw Option ZW. Akw Option ZW 2 pages. Shower screens

step 3
Slide doors into outer compensator, reattach the
adjusting plate and clamping plate loosely with
No. 6
x
3 /4
pan head screw
.
S S e e e e F F i i g g s s . . 3 3
step 4
Option Z
For fitting an option Z, fit the bottom cap
with clear silicon.
For fitting an option TT, fit the bottom
pivot to underside of post hinge adaptor
with No. 6 x 1 pan, before screwing the
panel compensator onto the post.
S S e e e e F F i i g g s s . . 4 4
Drill 3.5 mm diameter hole into the post
then fasten the panel compensator with
No.8 x
3 /4
pan head screw.
S S e e e e F F i i g g s s . . 5 5
step 5
Option Z
For fitting an option Z, fit the top cap
with clear silicon.
S S e e e e F F i i g g . . 6 6
For fitting an option TT, fit onto the
bottom pivot, then fit the spring into
door and fit top pivot with No. 6 x 1
pan. Then fit screw cover cap.
S S e e e e F F i i g g . . 7 7
Fig. 6
step 6
Fitting of other door/panel and post
are identical.
Align doors/panels with posts onto
tray and mark off hole positions.
S S e e e e F F i i g g . . 8 8
Viewed from outside of the tray
F F i i g g . . 2 2 b b
Compensator
No. 6 x
3
/
pan
4
Door
Fig. 3
Inside of tray
Option TT
OR
No. 8 x
3
pan
/
4
Fig. 4
Fig. 5
No. 6 x 1 pan
Option TT
Cover cap
No. 6 x 1 pan
OR
Top cap
Spring
Door
Fig. 8.
step 7
Disassemble the panel by removing the
outer compensators. The compensators
must be drilled and screwed to the post and
wall respectively (refer to diagram for the
correct screw size) with locking screw holes
at the top and facing inside the shower
base.
S S e e e e F F i i g g . . 9 9
step 8
Measure between the back of the
compensators at the top and bottom
points to allow for walls being out of
plumb, then deduct 15mm before
cutting PET, top and bottom rails
and wedge gaskets with a fine tooth
blade this allows for easy installation.
S S e e e e F F i i g g . . 1 1 0 0
Fig. 7
step 9
Door
Once cut and re-assembled, re-attach spacers
down both sides of the panel and slide down
between legs of compensators. The top rail
should be level with the top of the compensators.
With both locking holes facing into the showering
area drill through hole with a 3.5mm bit, using
uni-screw cap and No. 8 x
and fully tighten.
S S e e e e F F i i g g s s . . 1 1 1 1
1 1 2 2
& &
Panel
No. 8 x
3
/
"
4
pan head screw
Post
Drill 3.5mm
Diameter hole
into post
Drill 3.5mm
Diameter hole
into post
Measure distance
then -15mm
Cutting of PET/aluminium/rubber maybe done separately.
Assembly of these items is as follows:
Fit the top and bottom rail then fit the wedge gasket back into the
rails on the wet side of screen.
Fig. 11
Spacer
Top Rail
1 /2
pan head screw
Compensator
No. 8 x 1
1
/
"
2
pan head screw
Rail
Drill No.10
masonry bit
for wall plug
PET
Compensator
Spacer
Fig. 9
Rail
Viewed from outside of the tray
Fig. 10
Inside of tray
Note the offset
position of the
spacer
Spacer
PET
Fig. 12
Compensator
Panel