CANOPY US LED CNP-1-50 Series Manuel d'installation - Page 4

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} CANOPY US LED CNP-1-50 Series. CANOPY US LED CNP-1-50 Series 4 pages.

INSTALLATION INSTRUCTIONS - DRIVER BOX
1.
Turn off main power.
2.
Secure driver box assembly to mounting bracket by tightening mounting screws using ¼" hex driver.
See Figure 9.
3.
Secure mounting bracket to any vertical wall using #10 sheet metal screws supplied. Insure location allows wire
harness to reach low voltage side of power supply box. See Figure 10.
4.
Make internal primary side (high voltage) power connections by connecting wires, Black to Load, White to Neu-
tral and Green to Ground using approved electrical connector.
5.
Make secondary (low voltage) connections by connecting wires, Blue to Blue and Red to Red using approved
electrical connector.
6.
Secure driver box top using #8 sealing machine screws supplied.
7.
Turn on power.
FIG 9
Mounting screws
US LED
| 6807 PORTWEST DR | HOUSTON, TX 77024 | T 866 972 9191 | F 713 972 9393 | [email protected] | www.usled.com
INSTALLATION GUIDE
FIG 10
CNP-1-50
Page 4
#44-000017
Updated 09.21.12