Canyon 90-160 Instructions de montage - Page 3

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} Canyon 90-160. Canyon 90-160 5 pages. Step bunk bed

Canyon 90-160 Instructions de montage
CANYON FURNITURE COMPANY.
1.- ASSEMBLE FULL BED, USING TWO SIDE RAILS (F) ONE HEADBOARD (N), ONE FOOTBOARD (O),THE SAME WAY AS THE TOP SIDE RAILS SEE FIG.7
AND THREE SLATS (P), ONE SLAT IN BOTH HEADBOARD&FOOTBOARD ENDS AND PUSH SLATS AGAINST THE BED END POST (FIG.B), THEN PLACE
ONE SLAT IN THE MIDDLE AT EQUAL DISTANCE FROM THE END SLATS AND SECURE WITH 1 1/4" SCREWS (M) SEE FIG.11
2.- INSERT CASTERS (Q) WITH CASTERS SOCKETS (R) INTO BOTTOM CORNERS OF EACH HEADBOARD&FOOTBOARD, SEE FIG.C
3.- ROLL THE BED AND PLACE IT BETWEEN 3 DRW LOFT DESK OR 5 DRW LOFT CHEST AND STEP BUNK BED AS SHOWN IN FIG.12
FIG. 11
FIG. C
REV 02 09/30/09
PAGE 3 OF 5
KIS00949